The project included the fabrication and union worker installation of a new reception desk featuring drawer bases, laminate face diewalls, open base cabinets, solid surface countertops, MDF cabinet doors and drawer faces, and open cabinets with wood veneer. A distinctive powder-coated metal accent panel in orange adds a decorative design element. Electrical work involved adding a new circuit within the casework to support an under-cabinet refrigerator, reworking existing power for new TV locations, and installing a new data line for a media player. The project was completed within eight weeks.
Project Description
Pittsburgh,
PA
Owner
Mattress Factory
Mattress Factory
Client / Construction Manager
cd2 Consulting
cd2 Consulting
Architect
SmithGroup
SmithGroup
Markets
Sports & Entertainment
Materials